May 16, 2012:The Senate will convene at 9:30 a.m. Following Leader remarks, the Senate will proceed to the consideration of motions to proceed to the following budget resolutions, en bloc: S.Con.Res.41 (Senator Sessions-his interpretation of the Obama budget); H.Con.Res.112 (Congressman Ryan); S.Con.Res.37 (Senator Toomey); S.Con.Res.42 (Senator Paul); and S.Con.Res.44 (Senators Lee, Paul, DeMint). There will be up to 6 hours for debate on the motions to proceed, equally divided and controlled between the two Leaders or their designees. Upon the use or yielding back of time (at approximately 4:00 p.m. if all time is used), the Senate will conduct up to 5 roll call votes on the motion to proceed to each concurrent resolution. There will be 2 minutes of debate between each vote and all votes after the first vote will be 10 minutes in duration.
|
ENERGY AND WATER DEVELOPMENT |
Fiscal Year 2010 Appropriations Requests
Appropriation Bill: |
Energy and Water Development |
|
Project Name: |
Biomass boiler and steam absorption chiller plant |
|
Amount: |
$2,000,000 |
|
Applicant / Recipient Name: |
Black Hills State University |
|
Recipient Address: |
1200 University Blvd, Spearfish, SD 57799-9502 |
|
Explanation of Request: |
Funding will allow for additional planning, engineering design and initial construction of a new biomass-fired boiler and steam absorption chiller plant. The objective for this project is to replace the existing gas/oil boilers and electric chillers with a co-generation system that will use locally available woody biomass to fire a steam generating boiler for heating in the winter and to provide chilled water in the summer. |
|
Appropriation Bill: |
Energy and Water Development |
|
Project Name: |
Jonas Science Building |
|
Amount: |
$2,300,000 |
|
Applicant / Recipient Name: |
Black Hills State University |
|
Recipient Address: |
1200 University Blvd, Spearfish, SD 57799-9502 |
|
Explanation of Request: |
Funding will allow for renovation of the Jonas Science Building. The new Jonas Science Building will be a high performance, low energy consumption building designed for LEED Silver Certification. The Jonas Building will provide space for important energy-related science programs such as integrative genomics research for alternative energy sources. |
|
Appropriation Bill: |
Energy and Water Development |
|
Project Name: |
Canyon Lake Dam |
|
Amount: |
$4,279,000 |
|
Applicant / Recipient Name: |
City of Rapid City |
|
Recipient Address: |
300 Sixth St. Rapid City, SD 57701-2724 |
|
Explanation of Request: |
Improvement to existing structure through a combination of seepage cutoffs, support grouting and filtered drains to prove an adequate safety for seepage or a new spillway structure. |
|
Appropriation Bill: |
Energy and Water Development |
|
Project Name: |
Big Sioux River Flood Control Project |
|
Amount: |
$16,584,000 |
|
Applicant / Recipient Name: |
City of Sioux Falls |
|
Recipient Address: |
224 West Ninth Street Sioux Falls, SD 57104-6407 |
|
Explanation of Request: |
The Big Sioux Flood Control Project provides 100-year flood protection on the Big Sioux and Skunk Creek for the Sioux Falls, SD metropolitan area. The flood problem is severe under the present stage of urban development. P.L. 104-303 authorizes the Corps of Engineers to construct spillway improvements, raising levees, and raising existing diversion channel levees along the Big Sioux River. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Appropriation Bill: |
Energy and Water Development |
|
Project Name: |
Watertown Flood Control; General Reevaluation Report and Environmental Impact Statement |
|
Amount: |
$448,000 |
|
Applicant / Recipient Name: |
City of Watertown |
|
Recipient Address: |
23 Second St. NE, PO Box 910, Watertown, SD 57201-0910 |
|
Explanation of Request: |
Funding would support continued evaluation and identification of a preferred alternative to reduce the flood threat to the community of Watertown. Funds would be used to complete the General Revaluation Report (GRR) and Environmental Impact Statement (EIS). |
|
Appropriation Bill: |
Energy and Water Development |
|
Project Name: |
Lewis and Clark Regional Water System |
|
Amount: |
$35,000,000 |
|
Applicant / Recipient Name: |
Lewis & Clark Regional Water System |
|
Recipient Address: |
401 E. 8th St., Suite 306, Sioux Falls, SD, 57103 |
|
Explanation of Request: |
Lewis and Clark Regional Water System is constructing a water pipeline that, when completed, will provide treated water from the Missouri River to over 300,000 people in South Dakota, Iowa, and Minnesota through its 20 member cities and rural water systems. |
|
Appropriation Bill: |
Energy and Water Development |
|
Project Name: |
Mni Waste Rural Water System |
|
Amount: |
$2,030,000 |
|
Applicant / Recipient Name: |
Mni Waste Water Company |
|
Recipient Address: |
P.O. Box 490, Eagle Butte, SD 57625 |
|
Explanation of Request: |
Funds support execution of the first phase of pre-construction engineering & design work on the Mni Waste’ drinking water project, as authorized in the Water Resources Development Act of 2007 (P.L. 110-114). The current water delivery system is inadequate to meet the basic public health requirements of its citizens, while supporting economic development opportunities for the residents of north central South Dakota. |
|
Appropriation Bill: |
Energy and Water Development |
|
Project Name: |
Mni Wiconi Rural Water System - Construction |
|
Amount: |
$31,437,000 |
|
Applicant / Recipient Name: |
Oglala Sioux Tribe Rural Water |
|
Recipient Address: |
PO Box 2070 Pine Ridge, SD 57770 |
|
Explanation of Request: |
Funding will continue the construction of the Mni Wiconi Rural Water supply project, which was authorized in 1988 (amended in 2002 and 2007) and is currently more than 83 percent complete. Mni Wiconi will serve more than 50,000 residents in South Dakota, including three American Indian reservations that include some of the poorest counties in the United States. |
|
Appropriation Bill: |
Energy and Water Development |
|
Project Name: |
Mni Wiconi Rural Water System – Operations and Maintenance |
|
Amount: |
$10,526,000 |
|
Applicant / Recipient Name: |
Oglala Sioux Tribe Rural Water |
|
Recipient Address: |
PO Box 2070 Pine Ridge, SD 57770 |
|
Explanation of Request: |
Funding is required to comply with requirements of P.L. 100-516 as amended to support federal share of operation and maintenance costs for components of the system operated and maintained by the three Tribal sponsors. |
|
Appropriation Bill: |
Energy and Water Development |
|
Project Name: |
Perkins County Rural Water System |
|
Amount: |
$5,200,000 |
|
Applicant / Recipient Name: |
Perkins County Rural Water System |
|
Recipient Address: |
PO Box 431, 104 W Main Street, Bison, SD 57620 |
|
Explanation of Request:
|
The Perkins County Rural Water system was authorized in 1999 and is an extension of an existing authorized Bureau of Reclamation rural drinking water system in North Dakota – Southwest Pipeline. Perkins County is situated in a portion of South Dakota hardest hit by a eight-year drought, and communities in Perkins County struggle with water supplies that are contaminated with high levels of sulfates and sodium. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Appropriation Bill: |
Energy and Water Development |
|
Project Name: |
South Dakota Catalysis Group (SDCG) for Alternative Energy |
|
Amount: |
$1,100,000 |
|
Applicant / Recipient Name: |
South Dakota Catalysis Group (SDCG) for Alternative Energy |
|
Recipient Address: |
Slagle Hall 105, 414 East Clark Street, Vermillion, SD 57069 |
|
Explanation of Request: |
Funding will support research on advanced catalytic materials for solar energy utilization, specifically, hydrogen production and hydrogen fuel cells. |
|
Appropriation Bill: |
Energy and Water Development |
Project Name: |
Cheyenne River Sioux Tribe, Lower Brule Sioux Tribe, State of South Dakota |
Amount: |
$4,270,000 |
Applicant / Recipient Name: |
South Dakota Department of Game, Fish and Parks |
Recipient Address: |
523 East Capitol Avenue, Pierre, S.D. 57501 |
Explanation of Request: |
Title VI of the Water Resources Development Act of 1999 (P.L. 106-53) authorizes the State of South Dakota, the Lower Brule Sioux Tribe and the Cheyenne River Sioux Tribe to undertake terrestrial wildlife, recreation and cultural enhancement and mitigation projects to compensate for flooded lands as a result of the Pick-Sloan Flood Control Act and construction of the Missouri River mainstem dams. |
|
|
|
|
|
|
|
|
|
|
|
|
Appropriation Bill: |
Energy and Water Development |
Project Name: |
Sun Grant Initiative, South Dakota State University |
Amount: |
$4,000,000 |
Applicant / Recipient Name: |
South Dakota State University |
Recipient Address: |
Box 2201, Brookings, SD 57007 |
Explanation of Request: |
South Dakota State University is recognized as the primary national leader for the Sun Grant Initiative (SGI). SGI is working with the US Department of Energy through regional research efforts on feedstock production and sustainability. Funds will be implemented in the North Central region consistent with the Sun Grant authorization in the 2008 Farm Bill (section 7526, 7 U.S.C. 8701). |
Appropriation Bill: |
Energy and Water Development |
Project Name: |
Missouri River Fish and Wildlife Recovery Program |
Amount: |
$105,000,000 |
Applicant / Recipient Name: |
U.S. Army Corps of Engineers |
Recipient Address: |
Omaha District |
Explanation of Request: |
The project includes areas along the Missouri River and is designed to recover Missouri River species protected under the Federal Endangered Species Act and the ecosystem on which they depend. It also implements Fish and Wildlife Mitigation for the Bank Stabilization and Navigation Project. |
|